Speed Humps (0)
| 2019/2020 |
| 2020/2021 |
| 2022/2023 |
Roads Resurfacing 2013/2014 (2)
Roads Resurfacing 2014/2015 (3)
Roads Resurfacing 2015/2016 (4)
Roads Resurfacing 2017/2018 (5)
Roads Resurfacing 2018/2019 (6)
Roads Resurfacing 2019/2020 (7)
Roads Resurfacing 2020/2021 (8)
Roads Resurfacing 2021/2022 (9)
Roads Resurfacing 2022/2023 (10)
Roads Resurfacing 2023/2024 (11)
Roads Resurfacing Older (12)
Pothole Patching 2023/2024 (13)
Upgrading Gravel Roads 2023/2024 (14)
Contours (5m Intervals) (15)
Fire Hydrants (17)
Water Bulk (18)
Water Nodes (19)
Water Pumps (20)
Water Pipe Cracking (21)
Sewer Manholes (23)
Sewer Pumps (24)
Sewer Gravity Mains (25)
Sewer Rising Mains (26)
Convential Meters (28)
Prepaid Meters (ONTEC) (29)
| Active |
| Inactive |
SSEG Applications (Export Agreement) (30)
Solar Installations (31)
High Mast Lights (32)
| Existing |
| Proposed |
High Mast Lights Coverage (33)
Protected subs, mini subs and Pole Transformers (34)
Eskom power overhead lines (35)
11KV Conductors (36)
Sub stations (37)
| 11Kv |
| 66Kv |
66KV Conductors (38)
Areas Of Supply 2018 (39)
| Bulk Supply |
| Eskom |
| Municipality |
| Nil |
| Remove |
Load zones (40)
Storm Water Conduits (42)
| Status |
| Existing |
| New |
| Upgrade |
Storm Water Nodes (43)
Storm Water Outfalls (44)
|